Discussion:
[MLO] Moving task from Inbox to Project - Android 2.0.10
Tze-Yiu Yong
2015-12-10 22:45:06 UTC
Permalink
I'm using the Android MLO V2.0.10 app. Curious what the best way is to
move a task from Inbox to a subtask under a Project? At this point, my
methodology is

1. Go to Inbox.
2. Long press task and Copy
3. Go to Project and select clipboard with right pointing arrow (Copy /
Paste)
4. Paste as subtask
5. Go back to Inbox and delete task

Is that the best way to do this? Somehow I thought it would be easier.
--
You received this message because you are subscribed to the Google Groups "MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email to mylifeorganized+***@googlegroups.com.
To post to this group, send email to ***@googlegroups.com.
Visit this group at http://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit https://groups.google.com/d/msgid/mylifeorganized/57c5b4ff-c529-479b-a442-53f03aa8dd49%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
Dwight Arthur
2015-12-12 00:06:05 UTC
Permalink
hi. there are a few ways to do this. cut&paste (asyou described) is one, but if you select "cut" instead of "copy" you will not have to go back,and delete it afterwards.

the second way eould be drag&drop- click the four-headed arrow at the top right, grab the task and drag it to the project. There's a bug right now, if it stalls while you are dragging, forget this option and try it again in a few weeks.

Third option: select the task. Swipe right-to-left to raise the task preview. Scroll down to the bottom and select Move Task
--
You received this message because you are subscribed to the Google Groups "MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email to mylifeorganized+***@googlegroups.com.
To post to this group, send email to ***@googlegroups.com.
Visit this group at http://groups.google.com/group/mylifeorganized.
To view this discussion on the web visit https://groups.google.com/d/msgid/mylifeorganized/879dfef1-c561-4744-9c05-1bed03ef4d83%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.
Tze-Yiu Yong
2016-01-01 02:52:16 UTC
Permalink
Dwight - your suggestion for swiping right to left worked perfectly!
Thanks!
Post by Tze-Yiu Yong
I'm using the Android MLO V2.0.10 app. Curious what the best way is to
move a task from Inbox to a subtask under a Project? At this point, my
methodology is
1. Go to Inbox.
2. Long press task and Copy
3. Go to Project and select clipboard with right pointing arrow (Copy /
Paste)
4. Paste as subtask
5. Go back to Inbox and delete task
Is that the best way to do this? Somehow I thought it would be easier.
--
You received this message because you are subscribed to the Google Groups "MyLifeOrganized" group.
To unsubscribe from this group and stop receiving emails from it, send an email to mylifeorganized+***@googlegroups.com.
To post to this group, send email to ***@googlegroups.com.
Visit this group at https://groups.google.com/group/mylifeorganized.